Skip to content Skip to footer

The company participated in the technical and geological study that led to the construction of the Zongo II Dam, located in the province of Bas-Congo (now Kongo-Central). Thanks to this contribution, the scientific and technical foundations essential for the construction of the dam were established, ensuring the safety, durability, and performance of the infrastructure.

This mission consisted of conducting in-depth analyses of the site, assessing technical feasibility, and providing the necessary recommendations for the design of the structure.

With this company, you feel that they really listen to you and take a tailor-made approach. The end result exceeds our expectations and perfectly reflects our vision.

The Zongo II Dam is now a major component of the energy supply in the Democratic Republic of Congo.

individual approach to every project

We believe that no two projects are alike. That’s why we take an individual approach that combines technical expertise with personalized support.

By offering tailor-made solutions, we transform each project into a lasting success that meets our clients’ ambitions.

Leave a comment