t he project involved the construction of Avenue Kiyambi in the city of Lubumbashi, Haut-Katanga Province, under the supervision of the Office des Voiries et Drainage (OVD).
Successfully completed, Kiyambi Avenue is a key axis in the development of Lubumbashi, strengthening economic dynamism and improving the quality of life for residents. A Modern…
The company carried out studies, supervision, and monitoring of the construction work for the Golf Mall in Lubumbashi, covering a total area of 5,500 m². This project encompassed the entire process, from technical and architectural analysis to rigorous oversight of the execution of work on site. Thanks to continuous monitoring and effective coordination between the…
The company carried out the MOLADI housing project, an innovative initiative aimed at providing modern and secure housing. The MOLADI construction system, recognized for its speed and efficiency, enabled the creation of high-quality housing while keeping costs and deadlines under control. These facilities are designed to offer a functional and sustainable living environment tailored to…
The company participated in the technical and geological study that led to the construction of the Zongo II Dam, located in the province of Bas-Congo (now Kongo-Central). Thanks to this contribution, the scientific and technical foundations essential for the construction of the dam were established, ensuring the safety, durability, and performance of the infrastructure.…
The company has conducted several architectural and technical studies for private projects, focusing on the design of universities, villas, apartments, and offices.By relying on a rigorous methodology and multidisciplinary expertise, the company was able to provide solutions that comply with international standards, while taking into account budget, deadline, and sustainability constraints.
These projects involved…
The company provided facility management services for the construction of a 10 million liter bulk diesel storage facility for electricity generation at the Kamoa Copper mining site in the DRC.
This mission ensured compliance with safety and quality standards, while guaranteeing the energy efficiency and reliability of the facilities.
Carried out under an EPCM…
The company carried out the construction of infrastructure for the housing and smelter project at the Kamoa Copper mine site in the DRC, including the expansion of the villages of Kakula and Kamoa.
This large-scale project involved the construction of modern housing, civil engineering works, and related facilities necessary for the smooth operation of…
The company carried out technical studies and renovation work on the buildings of the Kipushi Corporation mine, covering a total area of more than 1,500 m². The objective was to modernize the buildings, improve their functionality, and enhance their durability, while complying with the safety standards in force in the mining sector.
This project…
The company carried out the Caisa Pharma project, a strategic initiative aimed at providing the pharmaceutical company with modern infrastructure tailored to its production and distribution needs. Built to international standards, the facilities ensure compliance with the quality and safety standards required in the pharmaceutical sector. This project demonstrates the company’s ability to support major…
The company carried out Housing Project Phase 2A on behalf of Kamoa Copper SA, covering the construction of modern housing for mining site personnel. Thanks to effective management and structured planning, the project was completed on schedule, while meeting international quality standards.
This phase enabled the creation of residential infrastructure over a large area, with…
The company completed the Camp Kamoa project, a residential and operational complex designed to accommodate staff at the Kamoa Copper SA mining site. The work was carried out in accordance with international quality and safety standards, ensuring comfort, durability, and functionality.
This camp was designed to provide modern accommodation, communal areas, and infrastructure…
The company carried out the Phase 2A housing project for Kamoa Copper SA, covering a built area of 7,476.8 m² in the Kakula and Kamoa areas. The work involved the design and construction of modern, safe, and sustainable housing that meets international quality and safety standards.
This phase is part of the overall…
